Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Team Owner

Indiv Owner

Task

Due Date

Status

PM

LC

Set up Release Plan team meeting(s)

9/12

(tick)

Eng

JS

Communicate code freeze to developer list (template), and release schedule to community

-

(tick)

Eng

JS

Create release branch in source control

-

(tick)

Eng

JS

Add build/deploy of release branch on continuous integration server

-

(tick)

QA

LC

Begin functional testing of Initial Testing Candidate build

9/12

(tick)

All

JS

Scrub bug list during general bug triage meeting; fixing only show-stoppers after this point

9/12

(tick)

Eng

JS

Bump artifact versions in Maven POMs to next release. Rev module versions on head/master and plugins/master

-

(tick)

Eng

JS

Double-check licenses of any 3rd party libraries added since last release

-

(tick)

Eng

JS

Update release-upgrades.txt so correct db schema version name appears on sysinfo page.  Tag release with appropriate version number.

9/12

(tick)

PM

JS

Revisit release packaging - Documentation (if any new or removed docs, actual content revisited later)

-

(tick)

PM

JS

Revisit/define default configuration to ship with product (local.properties)

-

(tick)

Eng

JS

Update Install File bundled in zip (INSTALL in top level of source control). Update Upgrade instructions (note changes in hardware/software and specific versions to upgrade to, also special upgrade procedures)

-

(tick)

PM

JS

Update Configuration guide, Update custom properties that ships with Mifos with new additions

-

(tick)

Eng

JS

Update System Recommendations, Client Machine Recommendations

-

(tick)

Eng

JS

Update Developer Documentation (any changes in dev environment, etc)

-

(tick)

PM

JS

Update and Complete Release Notes, Upgrade Instructions

-

(tick)

PM

JS

Update Functional Specs (UpdateinFS bugs, any new or updated features)

-

(tick)

Eng

JS

Final Release Candidate build ready - no changes allowed after this date

9/12

(tick)

Eng

JS

Identify final release candidate (binary release Zip File with Installation Doc, War file, and supporting code). Note: binary release .zip files are automatically generated with every release branch build. Make sure language files are included

9/12

(tick)

QA

LC

Confirm all translations are in package and mifos runs in FR, SP, CN

9/12

(tick)

QA

LC

Testing of Release Candidate Complete, give go-ahead (do diff w/ previous release)

9/12

(tick)

Biz

ET

Create Draft announcement for mifos.org

9/13


PM

ET

Create Draft announcement for community

9/13


Biz

ET

Create Draft announcement for customers

9/13


PM

JS

Final Documentation ready (release notes, install doc, etc)

9/13

(tick)

PM

JS

Mark versions in Jira as released

9/13

(tick)

QA

LC

Test Download, release notes pre-release page

9/13

(tick)

Eng

 

Release Day: see below

9/13

 

QA

LC

Report Test results and risks

  9/13

(tick)

Release Day

Team Owner

Indiv Owner

Task

Status

Eng

JS

Upload Release Binary Zip

(tick)

QA

LC

Test Live Download

(tick)

All

ET

Announce Release on mifos.org

 

PM/Eng

ET

Announce Release on functional, developer, and user lists

 

PM/Eng

ET

Announce Release on Sourceforge

 

Biz

ET

Announce Release internally at GF

 

All

 

Main:Launch Party

 

...