Week 1 (June 09) | Implementing the workflow with a simple entity such as Office. |
Week 2 (July 16) | - Implementing Client Import template where the first sheettwo sheets of workbook is are pre-formatted with existing Offices and Personnel entered through the MifosX platform and these constraints are imposed on the second third worksheet.
- Import of the above workbook.
|
Week 3 (July 23) | - Implementing Client Loan import template where the first three sheets of workbook is pre-formatted with existing Loan Product and Loan Officers configuration entered through the MifosX platform and Clients entered in the above step and these constraints are imposed on the fourth worksheet.
- Import of the above workbook.
|
Week 4 (July 29) | - Implementing Client Repayment History import template where the first sheet of workbook is pre-formatted with Client Loans imported in the first step and these constraints are imposed on the second worksheet.
- Import of the above workbook.
|
Week 5 (Aug 4) | Mid-term evaluations |
Week 6 (Aug 11) | - Implement Saving Account import template where the first two sheets of workbook is pre-formatted with existing Offices and Clients imported in the first step and these constraints are imposed on the third worksheet.
- Import the above workbook.
|
Week 7 (Aug 18) | TBD |
Week 8 (Aug 25) | TBD |
Week 9 (Sept 1) | Implement any validation code that is missing in the platform regarding data import. |
Week 10 (Sept 8) | Refactor the code base. |
Week 11 (Sept 15) | Check through various test cases if the code breaks anywhere. |
Week 12 (Sept 27) | Write tests, documentation, and submit final evaluation. |