Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

...

In terms of the interest posting date-- im not sure why mifos calculates this date as the end of January. Seems like it should be the End of December as per the FS.

> When I changed the system date so that it would calculate the> interest, the dates were changed to LAST_INT_CALC_DATE => 2007-12-22 NEXT_INT_CALC_DATE = 2007-01-21 NEXT_INT_POST_DATE => 2008-01-31>>From the functional spec for savings product> http://www.mifos.org/knowledge/functional-specs/product-defini> tion#savings> I see that the "Time period for interest rate calculation"> has a note "Reference for time period is the start of fiscal year for> all product instances."
I'll make sure the functional spec clarifies that the fiscal year is assumed to be Jan 1st.
> And for "Frequency of interest posting to accounts" has a note> "Interest should be posted on the last day of the month for all the> accounts."
Yep, I remember this. I believe I'm to blame for this requirement (smile) . I didn't think there would ever be a need to post interest mid-month and I wanted to keep the requirements simple for our first release.
> What this means is that my months are based on number of days so if I> say 30 days, then in december (based on the Jan 1st fiscal year), my> interest calculation date becomes 2007-12-22, however the posting will> only happen at the end of the gregorian month (which in my example,> even when I had selected 6 months, the date became the end of the next> month).
Yeah, this seems like a bug. Should be Dec 31st.

Session Time Out configuration

See http://groups.google.com/group/mifosdeveloper/browse_thread/thread/801384b810de062a